Skip to content

Latest commit

 

History

History
29 lines (24 loc) · 827 Bytes

Doors_Phase2.md

File metadata and controls

29 lines (24 loc) · 827 Bytes
title subtitle author email summary header-includes
Remodel Phase 2 (Doors)
Richland Prefab 2BR
John D. Fisher
jdfenw@gmail.com
Proposed Phase 2 changes to the BR#1 and BR#2 doors. Collect plans for Phase 2 to be completed separatetly from the Phase 1 Kitchen, Living Room and Bedrooms.
```{=html} <link rel="stylesheet" type="text/css" media="print" href="print.css" /> ```

Doors Phase 2

Bedroom #1 Door Phase 2

  1. Raise door jamb close to ceiling.
  2. Replace door. Frosted glass or similar synthetic material is desired to allow natural light into hall.

Bedroom #2 Door Phase 2

  1. Raise door jamb close to ceiling.
  2. Replace door with barn door. Frosted glass or similar synthetic material is desired to allow natural light into hall.
  3. Add cabinet door for closet.