Skip to content

Skip Mode

Skip Mode #8567

Triggered via pull request September 19, 2024 13:01
Status Failure
Total duration 1m 59s
Artifacts 1

bash.yml

on: pull_request
Matrix: bash-docker
Fit to window
Zoom out
Zoom in

Annotations

5 errors
bash-docker (5.0)
Process completed with exit code 1.
bash-docker (4.2)
The job was canceled because "_5_0" failed.
bash-docker (4.2)
The operation was canceled.
bash-docker (3.2)
The job was canceled because "_5_0" failed.
bash-docker (3.2)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cylc-run (bash-5.0)
158 KB