Skip to content

Optimize build trace handling #10682

Optimize build trace handling

Optimize build trace handling #10682

Triggered via pull request September 27, 2023 22:48
Status Cancelled
Total duration 19m 43s
Artifacts 1

build_and_test.yml

on: pull_request
build-next  /  build
45s
build-next / build
build-native  /  build
22s
build-native / build
test unit  /  build
test unit / build
validate-docs-links
16s
validate-docs-links
test cargo unit  /  build
24s
test cargo unit / build
test cargo integration  /  build
44s
test cargo integration / build
test cargo benchmarks  /  build
41s
test cargo benchmarks / build
rust check  /  build
22s
rust check / build
Matrix: test dev
Matrix: test integration
Matrix: test prod
Matrix: test turbopack dev
Matrix: test turbopack integration
test firefox and safari  /  build
5m 14s
test firefox and safari / build
report-test-results  /  build
report-test-results / build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 2 warnings
test integration (5) / build
The run was canceled by @ijjk.
test integration (5) / build
The operation was canceled.
thank you, next
Process completed with exit code 1.
rust check / build
No files were found with the provided path: .turbo/runs. No artifacts will be uploaded.
test cargo unit / build
No files were found with the provided path: .turbo/runs. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
turbo run summary Expired
30.2 MB