Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Rollup of 7 pull requests #130109

Closed
wants to merge 22 commits into from

Conversation

matthiaskrgr
Copy link
Member

Successful merges:

r? @ghost
@rustbot modify labels: rollup

Create a similar rollup

Kobzol and others added 22 commits August 26, 2024 09:52
otherwise the test would build in the source root's `target` folder
it'll be easier to see and update the list: the other cmd args
can just be ignored
and make it the default for the compiler profile, as to prevent
unnecessarily checking out `src/llvm-project` with `"if-unchanged"`.
…ion`

because "Borrow" is the more idiomatic Rust term than "AddrOf".
…r-ozkan

use  `download-ci-llvm=true` in the default compiler config

rust-lang@1ca2708 made it so that the `src/llvm-project` submodule has to be checkout for `download-ci-llvm = "if-unchanged"` to know if the submodule has been changed, but that is not required, if the submodule hasn't been checkout it cannot have been modified.

~~This PR restore the previous behavior by only updating the submodule if it has already been checkout.~~

This PR makes `download-ci-llvm = true` check if CI llvm is available and make it the default for the compiler profile, as to prevent unnecessarily checking out `src/llvm-project` with `"if-unchanged"`.

r? ``@onur-ozkan``
Add test to build crates used by r-a on stable

r? ````@Kobzol````

I've opened other PRs for this one to work and they've landed already. I cherry-picked your commit, and added the last remaining pieces we needed I think.
…chenkov

Also emit `missing_docs` lint with `--test` to fulfil expectations

This PR removes the "test harness" suppression of the `missing_docs` lint to be able to fulfil `#[expect]` (expectations) as it is now "relevant".

I think the goal was to maybe avoid false-positive while linting on public items under `#[cfg(test)]` but with effective visibility we should no longer have any false-positive.

Another possibility would be to query the lint level and only emit the lint if it's of expect level, but that is even more hacky.

Fixes rust-lang#130021
…ieyouxu

run-make-support: Add llvm-pdbutil

Add llvm-pdbutil to run-make-support, so we can write better unit tests for PDB specific features.

r? `@jieyouxu`
`@rustbot` label: +O-windows
…ef, r=compiler-errors

Rename variant `AddrOfRegion` of `RegionVariableOrigin` to `BorrowRegion`

because "Borrow" is the more idiomatic Rust term than "AddrOf".
…ingjubilee

remove 'const' from 'Option::iter'

This is kind of pointless to be a `const fn` since you can't do anything with the iterator. It is also the only `const fn iter*` in the entire standard library. It probably got constified when `~const` traits got added everywhere, and then was forgotten to be de-constified when that was undone.

The rest of the const_option feature seems like it can reasonably be stabilized, but this one IMO should not be stabilized, and it's not worth creating a new tracking issue.

Cc rust-lang#67441
Fixes typo in wasm32-wasip2 doc comment
@rustbot rustbot added A-run-make Area: port run-make Makefiles to rmake.rs S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-bootstrap Relevant to the bootstrap subteam: Rust's build system (x.py and src/bootstrap) T-compiler Relevant to the compiler team, which will review and decide on the PR/issue. T-libs Relevant to the library team, which will review and decide on the PR/issue. rollup A PR which is a rollup labels Sep 8, 2024
@matthiaskrgr
Copy link
Member Author

@bors r+ rollup=never p=7

@bors
Copy link
Contributor

bors commented Sep 8, 2024

📌 Commit d4e2ba4 has been approved by matthiaskrgr

It is now in the queue for this repository.

@bors bors added S-waiting-on-bors Status: Waiting on bors to run and complete tests. Bors will change the label on completion. and removed S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. labels Sep 8, 2024
@bors
Copy link
Contributor

bors commented Sep 8, 2024

⌛ Testing commit d4e2ba4 with merge 8f429c5...

bors added a commit to rust-lang-ci/rust that referenced this pull request Sep 8, 2024
…iaskrgr

Rollup of 7 pull requests

Successful merges:

 - rust-lang#129473 (use  `download-ci-llvm=true` in the default compiler config)
 - rust-lang#129529 (Add test to build crates used by r-a on stable)
 - rust-lang#130025 (Also emit `missing_docs` lint with `--test` to fulfil expectations)
 - rust-lang#130048 (run-make-support: Add llvm-pdbutil)
 - rust-lang#130070 (Rename variant `AddrOfRegion` of `RegionVariableOrigin` to `BorrowRegion`)
 - rust-lang#130087 (remove 'const' from 'Option::iter')
 - rust-lang#130092 (Fixes typo in wasm32-wasip2 doc comment)

r? `@ghost`
`@rustbot` modify labels: rollup
@rust-log-analyzer
Copy link
Collaborator

The job x86_64-gnu-aux failed! Check out the build log: (web) (plain)

Click to see the possible cause of the failure (guessed by this bot)

@bors
Copy link
Contributor

bors commented Sep 8, 2024

💔 Test failed - checks-actions

@bors bors added S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. and removed S-waiting-on-bors Status: Waiting on bors to run and complete tests. Bors will change the label on completion. labels Sep 8, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
A-run-make Area: port run-make Makefiles to rmake.rs rollup A PR which is a rollup S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-bootstrap Relevant to the bootstrap subteam: Rust's build system (x.py and src/bootstrap) T-compiler Relevant to the compiler team, which will review and decide on the PR/issue. T-libs Relevant to the library team, which will review and decide on the PR/issue.
Projects
Status: Done
Development

Successfully merging this pull request may close these issues.